Traffic Shift On Route 17 For Dragon River Bridge Project

A heads up if you use Route 17 southbound near the Gloucester/Middlesex County line. On Thursday traffic will be shifted to the left travel lane and once that’s done the right travel lane will become a 24-hour single lane closure so construction can continue on the Dragon Run Bridge. That closure will remain in effect until August which is the planned date for completing the bridge rehabilitation project.