The Urbanna Town Council okays the design of the proposed community swimming pool. The Southside Sentinel reports an issue is the location of a pavillion proposed by Urbanna Beautification Inc. The design locates the pavillion by the pool but the organizations wanted it to be in a separate place in Taber Park. Alternative locations were discussed but there was no resolution. to the dilemma. The pool’sa completion goal is by Memorial Day next year.