Construction is under way on a new bridge on Route 637 over Cat Point Creek. News on the Neck reports the project is scheduled to be completed by February 2024. The bridge has been closed since June 2021 when a storm came through that area. The DOT decided that it was better to replace the entire span rather than repair it. The DOT says this new bridge will be made with concrete because it holds up better than steel in salty conditions.